Language
Negotiable
The date of payment from buyers deliver within days
Beijing
Long-term effective
2017-08-12 12:02
207
highlingdredger(Ms.)
Beijing
Industrial Zone, Zhuze Town, Liyang, Changzhou, Jiangsu, China (213351)
HL400 | |
Dredger LOA | 26.0m |
Hull size (LxBxH) | 19.0 x 7.5 x 2.0m |
Main pontoon (LxBxH) | 13.8x3.5x2.0m |
Side pontoon (LxBxH) | 19.0x2.0x2.0m |
Structure | Can be dismantle and re-assemble easily ,box structure, lower delivery cost |
Main engine brand and power | Cummins /746kW |
Auxiliary engine brand and power | Cummins/224kW |
Harbor generator | 30GF/cummins |
Dredging pump | War man technology |
Discharge pipe innerdiameter | 400mm |
Head | 45m |
Max dredging depth | 13m |
Water flow | 2500m/H |
Solid sand capacity | 500m/H |
Discharge distance | 1500m |
Cutter head diameter | 1450mm |
Cutter power | 70kW |
Draught | 1.4m |
Displacement | 180T |
Hydraulic control system | PLC Siemens |
Wire rope pulling force (Lifting winch ) *Quantity |
80KN *1 |
Wire rope pulling force (Traversing winch ) *Quantity |
80KN *2 |
Operation room | Adjustable chair, movable side-window, air condition, PLC system, signal lights and floodlights |
Total weight | 145T |
Total power | 970kW |
Total fuel oil consumption | 146L/H |